Logo

Sungrow Logger1000A-EU COM100D-EU - Teil 2 : IBN und Einstellungen - technische Schulung

Date

Wednesday, September 24, 2025

Time

10:00 AM Europe/Berlin

Convert to my timezone
This event is certified, please provide correct information.
This field is required.
This field is required.
This field is required.
This field is required.
This field is required.
This field is required.
This field is required.
Woran sind Sie vorwiegend interessiert?
This field is required.
This field is required.
This field is required.
Required fields
If you have already registered and can't locate your registration confirmation email, click here!
The email address is incorrect. Please double-check your email address.

A confirmation email with logging details has been sent to the provided email.

System configuration test. Click here!

Sungrow Germany

Agenda

Sungrow Logger1000A-EU COM100D-EU technische Schulung für Planer, EPC und Installateure

Teil 2: IBN (Inbetriebnahme) und Einrichtung

  1. Hinweis: Das Trainingszertifikat ist nur gültig wenn auch Teil 1 abgeschlossen ist : e-Schemata und signaltechnische Anbindung (in getrennter Schulung)

  2. o Anbindung an WLAN, LAN oder 4G
  3. o Finden der WR (ggf. auch des SHT Hybrids)  und des PowerStack EMS300CP Loggers
  4. .o Einbinden an EZA-Regler/EEA-Regler/PPC/DV-Controller/SCADA
  5. o Einrichten RSE/FER falls nicht am EZA-Regler/EEA-Regler/PPC/SCADA
  6. o Kommunikation zu den WR und ggf. weitere Geräte (z.B. Wetterstation)
  7. o Kommunikation: Modbus RTU, Modbus TCP,  Modbus-ID der Geräte, IEC..104, ftp 
  8. o Einstellen der Fallbackwerte für Blind- und Wirkleistung von WR und Logger für loss-of-control und loss-of-communication
  9. o  Kurze Einführung Logger3000 (COM100A) und Logger4000 (EMU200A)

  10. Hinweis: Parallelbetrieb mehrerer Logger 1000A-EU oder mehrerer Energy Meter ist eine weitere getrennte Schulung und für dieses Trainingszertifikat nicht erforderlich.